Series 9000 Case Study: Readymix Concrete Plant

Before precleaner installation, filters were blown-out every 250 hours (not recommended) and changed every 500 hours in accordance with the planned maintenance schedule. Cost* for parts and labor: $1006.50 per machine. [continue reading] Series 9000 Case Study: Readymix Concrete Plant

XLR Powered Precleaner Case Study: Wheel Loader in a Cement Factory

Sy-Klone International is proud to support equipment owners and operators around the world.  With our revolutionary products and disruptive technology, our customers are experiencing the benefits of machine up-time and cost savings like never before, as in this case study for the XLR Powered Precleaner® on a wheel loader in Belgium. [continue reading] XLR Powered Precleaner Case Study: Wheel Loader in a Cement Factory

   

Sy-Klone®, Series 9000®, RESPA®, XLR Powered Precleaner®, RadialSHIELD®, OPTIMAX®, Gideon®, and Vortex HyperFLOW® are registered trademarks of Sy-Klone International.
Copyright © 2019 Sy-Klone International.